To prevent damage to the Geo-Grid, the site should be free of sharp objects, cleared of all debris, stumps, plant growth, top soil, stones, and other materials. Place the rolls of Geogrid in position, cut the roll bands and manually unroll the material over the prepared surface. In some instances where very low subgrades are present, it may be beneficial to leave some vegetation, top soil, and fine root mats in place. Proper equipment should be used to smooth and compact the subgrade to the specified requirements. Check with the engineer for subgrade compaction requirements. The engineer shall verify that the subgrade and elevations are ready for Geogrid installation. For moderately competent soils (CBR > 2), it may be prudent to lightly proof roll the subgrade to locate unsuitable materials. When possible, backdrag to smooth out any ruts. Smooth grade and compact the soils using appropriate compaction equipment. Swampland, peat, muskeg or marshes may be difficult to smooth grade and/or compact. In these situations, create a surface that is as uniformly smooth as possible. Grade or crown the surface for positive drainage away from the construction zone.